AIFILTECH High-Temp Flue Gas Cleaning System - Industrial Emission Control Plant

Process End-to-end custom
Filter Media In-house R&D & build
Operation PLC central control

Product Introduction

AIFILTECH high-temp flue gas cleaning systems cover the complete process chain from gas capture, pre-cleaning and high-temperature filtration to induced draft and stack discharge - engineered per operating conditions for carbide, ferroalloy, incineration and building material plants to achieve consistent emission compliance.

Specifications

FeaturesFull-chain custom
CustomYes
BrandAIFILTECH
ProcessCapture + pre-cleaning + hot filtration + stack
Temperature按工况选配 (上限 1600 ℃)
Extension脱硫/脱硝/活性炭喷射optional
ControlPLC 集控/在线监测
ServiceDesign, build, install, commission, O&M

Detailed Overview

01 Product Overview

The system is engineered per flue gas conditions: hot gas is captured by hoods and ducting, passes through spark arrestors and pre-separators for coarse dust and sparks, then the high-temperature filter (ceramic tubes / metal cartridges / filter bags) for fine filtration, with flame arrestors, bypass and cold-air dampers for protection, and finally induced by a high-temperature ID fan to the stack. Optional desulfurization tower, quench tower, activated carbon injection and SNCR/SCR DeNOx units form a multi-pollutant system; online gas monitoring and PLC central control enable unmanned operation.

02 Working Principle

System design centers on condition matching: gas volume, temperature, dust concentration, resistivity and corrosivity are measured first, then filtration velocity, media material and cleaning parameters are selected. Bypass and cold-air dampers protect the media under fluctuating conditions; pre-coating is applied for sticky gases. Differential pressure, temperature and concentration data of each unit feed the PLC with interlock protection and remote monitoring for long-term stable operation.

03 Advantages

  • Full-chain design from capture to stack with single-point responsibility; 2. Core filter media developed and produced in-house for excellent system-media matching; 3. Multi-pollutant synergy - dust removal with optional desulfurization, DeNOx and dioxin control; 4. 20+ years of hot gas engineering experience with references in carbide and incineration industries; 5. PLC central control and online monitoring supporting remote O&M and data upload.

04 Applications

Applied to emission compliance and ultra-low emission retrofits for calcium carbide furnaces, submerged arc furnaces, medical and municipal waste incinerators, cement and glass kilns. Complete services from design, manufacturing, installation and commissioning to operation & maintenance contracting.

Sizing & selection Q&A

What inlet temperature is allowed?

Filter media is selected per duty, up to 1600 °C. Above that, the gas needs pre-cooling or tempering air, and casing and tube sheet are built for the matching temperature band.

Which test method is used for acceptance?

It is measured by the method written into the contract, at agreed points and load bands — not against catalogue values.

Is it a turnkey system or the main unit only?

Both are possible: turnkey, or main unit and media for the owner to complete. The split is written line by line in the technical agreement.

Can media be changed without stopping the line?

Compartments are isolated one at a time, so the rest of the unit stays in service.

Applications

Carbide furnace Waste incineration Cement kiln Ultra-low emission retrofit

All data above are obtained under specific test conditions; the actual solution must be engineered to site conditions. AIFILTECH provides custom design and sizing based on actual gas volume, temperature, dust characteristics and emission limits.

WhatsApp