These 32 questions cover the topics buyers raise most often about high-temperature dust collection systems and epc. Answers are based on AIFILTECH product documentation, maintenance guides and field experience, and sit alongside the main FAQ hub and the companion guides in this series. Technical values are governed by the model test report and the signed technical agreement.
All 32 questions at a glance
- 1. What flue gas parameters must the buyer provide before designing a high-temperature dust collection system?
- 2. Should gas volume be given at actual or standard conditions, and are oxygen, humidity and pressure needed?
- 3. How do particle size, stickiness, abrasiveness, hygroscopicity and chemistry affect selection?
- 4. Can high-temperature gas enter the collector without cooling?
- 5. What if the temperature exceeds what the media can withstand?
- 6. Does supply include the housing, media, fan, ducting, insulation, valves, controls and ash discharge?
- 7. What is in scope of supply, and what must the buyer arrange separately?
- 8. Can an existing electrostatic precipitator or baghouse be retrofitted rather than fully replaced?
- 9. How long is the shutdown for a retrofit, and can it be staged to cut production loss?
- 10. What are the system pressure drop, fan power and compressed air consumption?
- 11. How is the cleaning system controlled, and can it adjust automatically to pressure drop?
- 12. Are leak detection, broken-bag location, temperature alarm and differential-pressure alarm available?
- 13. How is explosion protection designed when the dust is combustible or explosive?
- 14. Can the system connect to an existing PLC or DCS?
- 15. Which of outlet concentration, system resistance, noise and energy use are covered by performance guarantees?
- 16. Who is responsible for hot commissioning and performance acceptance?
- 17. What is the rectification and retest process if acceptance targets are not met?
- 18. Are operation training, as-built drawings, control logic and spare parts lists provided?
- 19. How is post-commissioning inspection and technical support charged?
- 20. Which locations suit ceramic fibre board, paper, blanket and vacuum-formed shapes?
- 21. What is the difference between classification temperature and long-term continuous use temperature?
- 22. Can thermal conductivity curves at different temperatures be provided?
- 23. How are linear shrinkage and service life assessed after high-temperature use?
- 24. Can shaped parts be drilled, slotted, cut and bored to drawing, and what are the tolerances?
- 25. Are dust precautions required during installation, and is an SDS available?
- 26. How to choose between ceramic fibre, graphite and mica for high-temperature gaskets by temperature, medium and pressure?
- 27. Do seals contain asbestos, and can a material declaration be provided?
- 28. Do medium temperature and ambient temperature for a high-temperature solenoid valve use the same rating?
- 29. How to select voltage, orifice, ingress protection and leakage class for a solenoid valve?
- 30. How are airflow, pressure and temperature rating of a high-temperature induced-draft fan matched to the collector?
- 31. Can the induced-draft fan use variable-frequency control, and how are bearings cooled and lubricated?
- 32. Are wear parts and repair kits available for high-temperature valves, fans and seals?
System design and EPC scope
1. What flue gas parameters must the buyer provide before designing a high-temperature dust collection system?
Provide maximum, normal and minimum gas volume; continuous and peak temperature; pressure, humidity, oxygen content and dew point; inlet dust concentration, particle size and chemical composition; corrosive, flammable and explosive gas data; and the target emission. Also provide the process flow, operating shifts, existing equipment, site, utilities and local acceptance requirements.
2. Should gas volume be given at actual or standard conditions, and are oxygen, humidity and pressure needed?
Both should be supplied with the conversion basis stated. Equipment sizing and velocity normally use the actual flow at working temperature and pressure, while emission assessment often uses standard dry flow with a specified oxygen correction. Humidity and pressure affect volume, dew point and materials. A single Nm³/h figure without dry/wet basis, oxygen content and temperature/pressure easily causes design and acceptance deviations.
3. How do particle size, stickiness, abrasiveness, hygroscopicity and chemistry affect selection?
Particle size affects capture and cake formation; stickiness determines cleaning and blinding risk; abrasiveness affects the life of media, housing and bends; hygroscopicity relates to dew point and caking; chemistry determines corrosion, fire/explosion and disposal requirements. Obtain a representative ash sample and any necessary tests rather than selecting from generic industry ash properties.
4. Can high-temperature gas enter the collector without cooling?
Only if the media, seals, housing, valves, sensors and cleaning system all meet long-term operation at the worst-case temperature and peak. Material temperature resistance is only one condition; also assess thermal expansion, dew-point crossing, sparks, dust reactions and personnel safety. Beyond those boundaries, use controlled cooling or another process, and do not ignore emission conversion after dilution air is mixed in.
5. What if the temperature exceeds what the media can withstand?
Compare indirect heat exchange, evaporative cooling, controlled dilution air, high-temperature pre-separation or a change of media route. Consider heat recovery, water use, acid dew point, dust agglomeration, increased gas volume and temperature uniformity; dilution air increases the volume to be treated and water injection can cause caking. Provide multi-point temperature measurement, over-limit interlocks and abnormal-condition protection. AIFILTECH recommends direct high-temperature filtration wherever the media and complete-unit temperature limits allow, to reduce the equipment cost, footprint and energy use of a cooling stage.
6. Does supply include the housing, media, fan, ducting, insulation, valves, controls and ash discharge?
A complete package can be supplied, but a complete system must be defined by a list and a boundary drawing. State item by item whether the housing, media, fan, ducting, insulation, valves, controls, ash discharge, platforms and fire/explosion accessories are included, and who is responsible for cabling, air supply, foundations, stack and site installation.
7. What is in scope of supply, and what must the buyer arrange separately?
Use a three-column supply / installation / service boundary table covering the equipment body, standard accessories, spares, secondary design, civil foundations, steelwork, utilities connections, insulation cladding, lifting, commissioning and testing. State interface locations and completion status, to avoid extra cost and schedule disputes caused by missing foundations, power or air supply on arrival.
8. Can an existing electrostatic precipitator or baghouse be retrofitted rather than fully replaced?
Usually first assess whether the housing, hopper, fan and utilities can be retained, then decide on media, tube sheet, cleaning and airflow distribution changes. Check corrosion, strength, sealing, space and residual life of the original equipment, and recalculate area, resistance and temperature. If reliability or performance cannot be guaranteed after retrofit, recommend partial or complete replacement explicitly.
9. How long is the shutdown for a retrofit, and can it be staged to cut production loss?
Duration depends on isolation, cooling, demolition, housing modification, installation and hot commissioning; a fixed number of days cannot be promised before a site survey. Multi-compartment collectors can be assessed for compartment-by-compartment or line-by-line work, provided the operating and construction zones are safely isolated, airflow is rebalanced and temporary emissions remain compliant. Provide a construction network plan and the critical shutdown windows.
10. What are the system pressure drop, fan power and compressed air consumption?
System resistance should cover the clean and dust-loaded collector, ducting, valves, cooling and downstream equipment; the fan is selected for the worst case with a reasonable margin, and power is calculated from actual flow, total pressure and efficiency. Compressed air consumption is calculated from pulse valves, air per pulse, frequency and simultaneity. Give both normal and peak figures in the quotation.
11. How is the cleaning system controlled, and can it adjust automatically to pressure drop?
Use pressure-drop priority, timer fallback, or a combination, cleaning compartments in sequence with a minimum interval to avoid over-cleaning that damages the cake. If the differential-pressure sensor fails, alarm and switch to a safe mode. Parameters are optimised during hot commissioning against ash properties and pressure-drop recovery, not fixed at one high-frequency pulse setting.
12. Are leak detection, broken-bag location, temperature alarm and differential-pressure alarm available?
Compartment differential pressure, outlet dust trend, high/low temperature limits and leak-test ports can be configured by project to locate an abnormal compartment. The precision of broken-bag location depends on compartment and instrument configuration; automatic location cannot be promised without sensors. Alarms should have delays, deadbands and fault diagnostics, with an event log retained.
13. How is explosion protection designed when the dust is combustible or explosive?
First obtain dust explosibility parameters (Kst, Pmax, determined per GB/T 16426 and equivalent) and carry out a dust hazard analysis. Then define source control, anti-static bonding and grounding, spark detection, explosion venting, isolation, suppression, explosion-resistant design, inerting with oxygen monitoring, temperature monitoring and airlock ash discharge. Vent area is calculated per GB 15605-2024 / NFPA 68, and GB 15577-2018 does not permit isolation as the sole measure. Domestic projects must comply with mandatory standards including GB 15577-2018 and GB 17919-2025; exports to the EU follow ATEX 2014/34/EU, and North America follows NFPA 660 (2025 edition, which consolidates NFPA 652/654; NFPA 68/69 remain separate). A metal filter bag is not inherently explosion-proof; the system is designed to the target country regulations, dust test results and site conditions, with third-party review by a qualified body where needed.
14. Can the system connect to an existing PLC or DCS?
Yes, via hardwired contacts, analogue signals or industrial communications. Define the control boundary, protocol, point list, power supply, network and interlock responsibilities at the design stage. State whether key safety protections are implemented locally or in the host system, and test the safe state on communication loss.
15. Which of outlet concentration, system resistance, noise and energy use are covered by performance guarantees?
Performance guarantees can be quantified item by item, usually covering outlet particulate concentration, system resistance, temperature, air leakage rate and operating noise.
16. Who is responsible for hot commissioning and performance acceptance?
Hot commissioning is normally led by the supplier for control and equipment optimisation, with the buyer providing process, utilities and safety support. Performance acceptance may be joint or delegated to a qualified third party using an agreed method. The contract should distinguish commissioning completion, preliminary acceptance and final performance acceptance, and state the production load and handling of abnormal conditions during sampling.
17. What is the rectification and retest process if acceptance targets are not met?
First preserve the original data and operating conditions, jointly investigate inlet deviation, instruments, sampling, sealing, media and controls, then agree a time-bound rectification plan. Retesting uses the same or a mutually accepted equivalent method, with the number of tests, costs and remedies (model change, return or others) agreed if targets are still not met, to avoid unlimited open-ended testing.
18. Are operation training, as-built drawings, control logic and spare parts lists provided?
Complete delivery includes an operation and maintenance manual, as-built general and interface drawings, electrical drawings, control logic and alarm lists, certificates and inspection records, and recommended wear parts and two-year spares. Training covers normal operation, start-up and shutdown, cleaning, abnormal handling and safety isolation, with attendance and assessment records retained.
19. How is post-commissioning inspection and technical support charged?
Technical support after commissioning is quoted by service type: remote support within the warranty period, planned inspections, unplanned site visits and performance optimisation, each with agreed frequency, staffing, days, travel, spares and report content. Annual service packages and single-service quotations are both offered, with the start point for response time, warranty coverage and separately charged items made explicit. Services within warranty follow the contract; out-of-scope services are charged per quotation. Prices, coverage and response times are available on request.
Ceramic fibre products, seals, valves and fans
20. Which locations suit ceramic fibre board, paper, blanket and vacuum-formed shapes?
Board is relatively rigid and suits flat insulation, backing and machinable supports. Paper is thin and flexible, suiting gaskets and small-gap insulation. Blanket suits large-area wrapping, expansion joints and low-thermal-mass linings. Vacuum-formed shapes suit ports, burners and complex insulating geometries. Check hot-face erosion, mechanical load and installation method as well.
21. What is the difference between classification temperature and long-term continuous use temperature?
Classification temperature is defined by EN 1094-1 as the temperature at which permanent linear change (PLC) after 24 h isothermal heating does not exceed a specified value: ≤2% for boards and vacuum-formed shapes, ≤4% for blankets, felts and papers, graded in 50 °C steps. It is not a temperature at which equipment can run continuously. Continuous use temperature is a manufacturer recommended long-term limit under clean, oxidising atmosphere and is a non-standardised figure; EN 1094-1 notes that amorphous RCF/AES fibres are typically 100–150 °C below the classification temperature, while polycrystalline (PCW) fibres can be used continuously up to the classification temperature under different rules. Contaminants, reducing atmosphere, alkali attack, gas velocity and load further reduce the allowable temperature. State classification temperature, continuous temperature, test standard and application limits for each grade.
22. Can thermal conductivity curves at different temperatures be provided?
Yes, with product density, the definition of mean or hot-face temperature, test standard and direction stated. Ceramic fibre conductivity changes markedly with temperature and density, so a single ambient value must not be used for high-temperature insulation calculations.
23. How are linear shrinkage and service life assessed after high-temperature use?
Shrinkage should be reported for a specified temperature, holding time and standard test; excessive shrinkage opens gaps and creates thermal bridges. Life also depends on thermal cycling, gas erosion, chemical attack, vibration and compression, and cannot be derived from classification temperature or a 24-hour shrinkage figure alone. Design should control joints, anchoring and hot-face protection, with replacement based on condition inspection.
24. Can shaped parts be drilled, slotted, cut and bored to drawing, and what are the tolerances?
Ceramic fibre board and some vacuum-formed parts can be machined with holes, slots and shaped profiles, but tolerances depend on density, thickness, tooling, fired or dried state, and whether machining follows.
25. Are dust precautions required during installation, and is an SDS available?
Cutting and removal generate fibre and dust. Follow the product SDS and local occupational health requirements: local exhaust ventilation, suitable respiratory protection, protective clothing, wet or low-dust cleaning and sealed waste disposal; do not blow down with compressed air. RCF, AES and PCW materials are classified differently, so supply the current SDS for the specific grade rather than a generic statement.
26. How to choose between ceramic fibre, graphite and mica for high-temperature gaskets by temperature, medium and pressure?
Ceramic fibre focuses on high-temperature insulation and low-pressure sealing; graphite offers good temperature resistance and sealing but the oxidising environment must be checked; mica suits specific high-temperature, electrical-insulation and flange duties. Consider pressure, flange faces, medium corrosion, compression recovery and leakage class as well, not maximum temperature alone.
27. Do seals contain asbestos, and can a material declaration be provided?
Asbestos is a carcinogen. AIFILTECH products contain no asbestos, and a material declaration can be provided.
28. Do medium temperature and ambient temperature for a high-temperature solenoid valve use the same rating?
No. Medium temperature reflects the thermal effect of the fluid on the body, seals and internals; ambient temperature affects the coil and electronics. State the two separately. The coil also generates its own temperature rise, and mounting distance, insulation and heat dissipation change the actual ambient conditions.
29. How to select voltage, orifice, ingress protection and leakage class for a solenoid valve?
Match voltage to the control system and safety requirements, size the orifice from flow, medium and allowable pressure drop, set ingress protection from dust, water and installation environment, and choose leakage class from internal and external leakage risk. Also state normally open / normally closed, de-energised position, response time, seal material and explosion-protection requirements; pipe diameter alone is not enough.
30. How are airflow, pressure and temperature rating of a high-temperature induced-draft fan matched to the collector?
Set airflow from the maximum actual gas volume with a reasonable margin; pressure must cover the total system resistance in clean and worst-case dust-loaded states; temperature rating follows the actual fan inlet temperature and abnormal peaks. Check density changes, efficiency, turndown range, shaft seals and materials, and do not size from standard-condition airflow or motor power alone.
31. Can the induced-draft fan use variable-frequency control, and how are bearings cooled and lubricated?
Variable-frequency control can match the duty and reduce throttling loss, but motor, minimum speed, critical speed, cooling and explosion-protection requirements must be checked. Bearing cooling and lubrication follow fan model, inlet temperature and mounting position; typical arrangements are air- or water-cooled bearing housings with grease or oil lubrication, with greasing and oil-change intervals per the manufacturer manual.
32. Are wear parts and repair kits available for high-temperature valves, fans and seals?
Where the customer requires it, AIFILTECH can supply seals, bearings, lubricants, actuator wear parts and valve repair kits for the specific model, with part numbers, recommended stock and replacement intervals. Spare kits can be split into standard, one-year and two-year quantities.
Related FAQ guides and further reading
- Ceramic Fibre Filter Tubes and All-in-One Catalytic Tubes: Selection, Temperature Windows and DeNOx, 19 Questions
- Metal Filter Bags, Cartridges and Sintered Metal Media: Materials, Accuracy and Cleaning, 31 Questions
- Titanium Felt, Nickel Felt and Porous Titanium Plate for Water Electrolysis: Selection, Contact Resistance and Life, 16 Questions
- Testing, Certification, Pricing, Lead Time and Export Purchasing: 26 Questions
- Installation, Training, Warranty, After-Sales and Maintenance: 30 Questions
- Diesel Exhaust Purifier FAQ: 36 Questions
- Diesel Generator Exhaust Purifier FAQ: 22 Questions
- Forklift, Construction, Farm and Airport Vehicle DPF FAQ: 15 Questions
- DOC+DPF+SCR+ASC and Other Technology Routes FAQ: 18 Questions
Need a model confirmed for your duty, or the technical documentation? Send the gas or engine parameters, target emissions and site conditions, and we will check the applicable model and acceptance basis against the data.
Bruce Wen · +86 188 1936 6808 (mobile / WhatsApp / WeChat) · bruce.wen@aifiltech.com