AIFILTECH dp forklift install 1 - product photo

Testing, Certification, Pricing, Lead Time and Export Purchasing: 26 Questions

These 26 questions cover the topics buyers raise most often about testing, certification, pricing, lead time and export purchasing. Answers are based on AIFILTECH product documentation, maintenance guides and field experience, and sit alongside the main FAQ hub and the companion guides in this series. Technical values are governed by the model test report and the signed technical agreement.

All 26 questions at a glance

Testing, certification, cases and acceptance basis

1. Can a complete test report matching the purchased model be provided?

A traceable, complete report can be provided.

2. What do CMA and CNAS reports prove, and does the scope cover this project?

CMA (inspection and testing institution qualification accreditation) is a mandatory administrative licence under the Metrology Law, the Measures for the Administration of Qualification Accreditation of Inspection and Testing Institutions and RB/T 214-2017, issued by market-regulation authorities at provincial level or above for institutions issuing data with evidential effect; the report has legal effect in China. CNAS is voluntary accreditation of laboratory technical competence and management systems under ISO/IEC 17025 (GB/T 27025-2019), accepted among mutual-recognition economies through ILAC-MRA. Both assess institutional competence and the test items, methods and locations listed in the accreditation schedule; neither is product certification, and the report is valid only for the submitted sample, that method and the stated conditions. It is not equivalent to a manufacturer declaration of conformity.

3. Why do laboratory results differ from field performance?

Laboratories control the engine, load, fuel and sampling; on site there are load swings, idling, ageing, ambient conditions, piping and engine maintenance differences, and engine-out emissions and exhaust temperature may fall outside the test range. Installation sealing, filter ash and sampling position also affect results. Accept against agreed site conditions and use laboratory data to support design, not to replace field verification.

4. Can a third party carry out before/after comparison testing on our equipment?

Yes, as a prototype or project acceptance scheme, provided both parties agree in advance on the qualified institution, method, measuring points, load, fuel and engine state. Before and after tests should be run under comparable conditions, retaining engine-out and backpressure data, with costs, number of tests and handling of non-comparable cases agreed in advance.

5. Should site acceptance measure smoke opacity, particulate mass, NOx or other indicators?

Acceptance indicators are set by the treatment target, applicable standard and technical agreement. Where only black smoke is treated, acceptance is usually against the applicable smoke method and limit (for in-use non-road machinery, GB 36886-2018). Where a PM mass concentration is agreed, sample by the corresponding method (for low-concentration particulate from stationary sources, HJ 836-2017 may be referenced; the testing institution determines the current valid method). Projects with SCR also need NOx and, where necessary, ammonia slip; DOC may involve CO/HC. Different indicators are not interchangeable.

6. Who confirms the test equipment, sampling position and test conditions?

The buyer, supplier and third-party testing institution should confirm them jointly before the test. Equipment must meet method and calibration requirements, sampling positions must be representative and safe, and test conditions must cover the agreed rated and usual loads. Any temporary change to measuring points, load or data handling is recorded and signed by both parties.

7. Can cases and operating data from the same industry, machine type and similar duty be provided?

Comparable cases can be provided, but at least the engine or process, original conditions, product configuration, installation date, load, testing and maintenance records should be listed. The same industry does not mean the same flue gas or engine, and case-study figures cannot replace a project guarantee.

8. Which certifications, tests or technical documents are needed for export to the target country?

They depend on equipment category, application, country of installation and buyer requirements, and must be identified market by market rather than answered generically. The EU may involve Machinery Directive 2006/42/EC (replaced by Regulation (EU) 2023/1230 from 20 January 2027), PED 2014/68/EU (pressure equipment with maximum allowable pressure above 0.5 bar), ATEX 2014/34/EU (equipment and protective systems for explosive atmospheres), LVD 2014/35/EU, EMC 2014/30/EU and RoHS/REACH material declarations. Complete water-electrolysis hydrogen generators should also be checked against ISO 22734-1:2025; domestic projects may additionally involve GB/T 19774-2005 and GB 50177-2005. ISO 9001 is a quality-management system certification, not proof of product conformity; CE is a manufacturer declaration of conformity with the corresponding assessment procedure, and a third-party test report is not a DoC. No single certificate covers every country and application.

9. How is product configuration confirmed as applicable if local regulations or test methods differ?

First convert local limits, indicators, test cycles, fuel and installation requirements into design inputs, then check the equivalence and gaps of our reports; where needed, adjust the filter element, catalyst, control or monitoring and arrange local testing. Meeting one Chinese smoke or stationary-source result does not automatically demonstrate compliance with overseas road, non-road or marine engine requirements.

10. What exactly does meeting emission standards mean: which standard, limit and test method?

Different markets and equipment categories apply different standards; the acceptance method is determined by the applicable standard and the qualified testing institution using the current valid version. Questions of interpretation follow the standard text and the requirements of the local authority; Ministry of Ecology and Environment replies and mailbox answers are case-specific interpretations for reference only.

Pricing, MOQ, lead time and export purchasing

11. What components, technical services and taxes are included in a quotation?

A formal quotation lists equipment body, filter elements, sensors, valves, controls, accessories, spares, packaging, transport, installation and commissioning, training and third-party testing item by item, and states currency, tax-inclusive or tax-exclusive status, tax rate and payment terms.

12. Are the purifier body, filter elements, sensors, valves, piping and control cabinet priced separately?

It depends on customer requirements; different products suit different approaches. Quantities and unit prices can be listed separately, or a package price agreed, but the configuration detail and spare prices are normally retained. This helps compare options, add or remove elements later and calculate spare costs.

13. Are surveying, design or tooling fees charged for non-standard designs?

Whether site surveying, dedicated design, tooling, prototypes and testing are charged, and at what rate, depends on technical complexity and order arrangements, and is confirmed in writing before work starts.

14. How does single-unit trial pricing differ from volume purchase?

A single unit carries higher selection, production preparation, packaging and testing costs; volume orders gain scale advantages under the same specification and uniform delivery conditions.

15. Can a prototype order be signed first, with volume purchase decided after acceptance?

AIFILTECH supports single-unit minimum orders, so prototype validation before volume purchase is possible.

16. If the prototype fails, are rectification, model change or return supported?

The first unit is a paid purchase. We recommend the customer complete a re-test in their own country against the agreed duty and indicators, and confirm suitability before discussing long-term cooperation. If the re-test result does not match the agreed written technical indicators, first establish the cause, distinguishing product non-performance, changed customer conditions, improper installation and engine faults, then handle it under the inspection, rectification, model-change and retest clauses of the signed technical agreement and contract; responsibility for transport, dismantling and testing costs is stated in the contract.

17. What are the accurate lead times for standard and non-standard models?

Public reference lead times for standard models are about 15–20 days domestically and 20–28 days overseas; non-standard models are assessed against the current production schedule. These are dispatch references excluding transport time and excluding time for drawing approval, payment and other prerequisites. Accurate lead time is calculated from the specific model, quantity, frozen drawings, raw material and testing requirements; request current lead-time confirmation for the model before ordering.

18. Does the project lead time start from payment, drawing approval or technical parameter confirmation?

In principle it starts from payment.

19. Can production progress and factory inspection records be provided?

Yes.

20. Which trade terms are used for export, and is the quotation EXW, FOB, CIF or other?

AIFILTECH applies different trade terms according to customer requirements.

21. Is the packaging suitable for sea freight, moisture, vibration and long-distance transport?

Export packaging is designed to product weight, centre of gravity, fragility and route: ceramic filter tubes are protected against impact, metal parts against moisture with loose items secured, and electrical parts against moisture with markings; seaworthy wooden cases, cushioning, fixing, desiccant and centre-of-gravity/lifting marks may be used, with photos taken before packing. Where solid wood is used, it is heat treated (HT) or given an approved treatment per ISPM 15 and carries the IPPC mark (including the CN country code and treatment provider number), or plywood/engineered wood exempt materials are used, following the destination country quarantine requirements. If the goods contain catalysts, batteries, control cabinets or other components potentially subject to dangerous-goods rules, provide an SDS per the carrier and IATA DGR/IMDG and destination requirements, and confirm whether a dangerous-goods declaration, UN number and certified packaging are needed. Transport restrictions follow the actual composition of the goods and the carrier determination; no promise of exemption from inspection or clearance is given. Special stacking, moisture protection and transport-damage claim documentation are provided as agreed in the order.

22. Can packing dimensions, gross weight and a packing list be provided in advance?

Before dispatch AIFILTECH generally provides detailed data per case: case number, outer dimensions, net and gross weight, piece count, product model and spare parts list. Estimates can be given at budget stage, but final freight booking must use measured data after packing is complete to avoid volume and weight deviations.

23. What do the standard spares and the two-year spare parts package include?

Standard spares differ by product.

24. How are follow-up prices for filter elements and wear parts determined after a volume purchase?

A spare-parts price list, validity period, quantity tiers, raw-material or exchange-rate adjustment rules and a long-term supply commitment can be agreed in the main contract.

25. Are OEM, private labelling, regional agency or project cooperation supported?

AIFILTECH provides OEM customisation; private labelling, agency and project cooperation can be discussed with AIFILTECH sales at any time.

26. In which languages are product literature, installation manuals and test reports available?

Chinese and English versions are generally available; translations in other languages can also be provided if required.

Related FAQ guides and further reading

Need a model confirmed for your duty, or the technical documentation? Send the gas or engine parameters, target emissions and site conditions, and we will check the applicable model and acceptance basis against the data.

Bruce Wen · +86 188 1936 6808 (mobile / WhatsApp / WeChat) · bruce.wen@aifiltech.com

WhatsApp