Installation, Training, Warranty, After-Sales and Maintenance: 30 Questions

These 30 questions cover the topics buyers raise most often about installation, training, warranty, after-sales and maintenance. Answers are based on AIFILTECH product documentation, maintenance guides and field experience, and sit alongside the main FAQ hub and the companion guides in this series. Technical values are governed by the model test report and the signed technical agreement.

All 30 questions at a glance

Installation, training, warranty and after-sales

1. Is site surveying provided, and how is remote surveying carried out?

Site surveying can be arranged according to project complexity and region; a simple single unit can first be assessed remotely. Remote work uses a standard measurement form, photos with a scale and continuous video, recording interfaces, space, supports, maintenance access and utilities, with key dimensions reviewed by both parties. Complex high-temperature projects, lifting or multi-unit shared systems may need on-site confirmation.

2. Are interface and installation drawings provided for confirmation before production?

For non-standard and retrofit projects, dimensions are confirmed with the customer before manufacturing.

3. Do you install, or do local technicians?

Supplier installation, supervision of local personnel, or partner construction can be agreed by project. In every case, responsibility for lifting, welding, electrical work, insulation, structural review and safety permits is defined, and the work is carried out by qualified personnel.

4. How long does installation and commissioning of a single unit usually take?

Installation time depends on whether the equipment must be shut down, removal of the original silencer, piping and support modification, lifting and control wiring; a uniform number of hours cannot be given for all machine types.

5. What tools, lifting conditions, power and water are needed for installation?

AIFILTECH prepares a different implementation plan for each specific project.

6. Are video installation guidance and first remote commissioning provided?

AIFILTECH can include installation videos, user manuals and first remote commissioning in the delivery service, with network, language, timing and site personnel confirmed in advance. Before remote commissioning, mechanical, electrical and safety checks must be complete, with instrument readings and alarm status provided. Where high temperature, lifting or live flue gas is involved, site personnel must provide safety supervision.

7. Is training in operation, cleaning and fault diagnosis provided?

Yes, covering theory, use instructions and remote guidance for start-up and shutdown, backpressure and temperature reading, filter removal and installation, cleaning and drying, wastewater, alarms and safety isolation.

8. Are the warranty periods the same for the complete unit, filter elements, catalyst, valves and sensors?

They should not be assumed to be the same. The complete structure, washable filter elements, catalyst, valves, sensors and consumables have different lives and failure modes, so warranty period, applicable conditions and exclusions are listed separately in the contract.

9. Does warranty start from dispatch, arrival, installation or acceptance?

The start point can be stated in the contract – dispatch, arrival, installation or acceptance – with a maximum cut-off where installation is delayed for customer reasons.

10. What counts as warranty, and what counts as misuse or normal wear?

Warranty covers failure caused by material or manufacturing defects under the agreed duty, judged from operating records, maintenance logs, fuel/oil/urea quality records and test evidence. Exclusions normally include natural wear of consumables and wear parts such as filter media and seals, sensors and urea; soot and ash accumulation; exhaust temperature above the technical agreement limit; fuel sulphur or oil/urea quality not meeting agreed specifications; engine faults, overload and intake/combustion anomalies; failure to clean or maintain per the manual or missing maintenance records; unauthorised modification, altered bypass or control calibration, non-specified spares; incorrect cleaning, vibration, impact and force majeure. See the manual for each product category.

11. What is the after-sales procedure for persistent black smoke, high backpressure or excessive emissions?

First stop safely or restrict abnormal operation, then check alarms, backpressure, exhaust temperature, load, fuel and oil and recent maintenance. Inspect engine combustion, filter blocking or damage, seal bypass, sensors, piping and controls in sequence. Where needed, carry out before/after or staged testing and close the loop with cause, action and re-verification. Removing the element immediately or running on permanent bypass is not recommended.

12. What operating data does the customer need to provide for fast fault diagnosis?

At minimum provide equipment and filter element numbers, engine model, operating hours, load, fuel and oil, backpressure, exhaust temperature, alarms and valve positions, recent cleaning and engine repair records, plus a black-smoke video, instrument photos and filter appearance. For NOx systems, also provide urea quality, level, injection and NOx data.

13. Is remote video diagnosis available, and what is the typical response time?

AIFILTECH can provide remote video as a preliminary diagnostic method, but response time varies by working day, time zone, service level and fault urgency; where safety is at risk, stop and isolate per the manual first. Specific response times follow the service level and service order.

14. How are travel and service costs calculated when an overseas customer needs on-site service?

The contract or service order distinguishes in-warranty from out-of-warranty service and lists each cost, with the start day and cancellation rules stated. Issues that can be resolved remotely are diagnosed remotely first; tools and work permits must be ready before a site visit is confirmed.

15. Are common spares kept in stock, and how quickly are international orders dispatched?

It differs by product: stock of filter elements, seals, sensors and ceramic fibre filter tubes must be confirmed separately before a delivery date can be given.

16. How is warranty recalculated after a filter element or part is replaced during the warranty period?

Warranty policies differ by product; see the warranty policy for each category.

Maintenance, safety and whole-life cost

17. Which instruments and states should be checked daily?

Check backpressure, exhaust temperature, abnormal black smoke, alarms, valve positions and leaks each shift or daily; for SCR equipment also check urea level, pump and NOx status. Observe supports, insulation, pressure tapping lines and electrical connections. Readings should be logged with operating hours and load; trends reveal blockage and drift better than single values.

18. Should cleaning intervals follow the calendar, operating hours or backpressure?

Use backpressure and filter condition as the primary basis, operating hours for planning, and calendar reminders to prevent low-use equipment being forgotten. The AIFILTECH maintenance guide gives a rough reference of about one to two weeks for ordinary forklifts, but explicitly requires backpressure to govern; high ash, low temperature and poor combustion shorten the interval, so a fixed date must not be applied directly.

19. How much water, labour and downtime does one cleaning take?

Water, labour and downtime depend on the number of elements, contamination level, cleaning equipment and drying method, and cannot be estimated from rinsing minutes alone. Count preparation and cooling, removal, washing, rinsing, drying, reassembly and wastewater treatment separately. For fleets, measure a per-element average and compare with spare elements and centralised washing. For AIFILTECH a single metal DPF takes about one minute to wash.

20. How should carbon-black-containing wash water be collected and treated?

Collect the wastewater centrally; do not discharge it to storm drains or onto the ground. It may contain soot, oil and ash, so use sedimentation, solid-liquid separation and compliant disposal according to its actual composition.

21. Is detergent recommended, and which cleaners damage the element?

Per the AIFILTECH metal DPF maintenance guide, clean water is sufficient for routine washing. For oily, sticky deposits from incomplete combustion, a small amount of mild neutral detergent can be added, followed by a thorough clean-water rinse to remove residue. Do not use strong acids, strong alkalis, chlorinated or strongly oxidising solvents, or unlabelled heavy-duty degreasers: these can corrode the element alloy, welds, coating or catalytic layer and change the wastewater. Compatibility of any cleaner with the media, seals and subsequent high-temperature use should follow the manual or a written approved list; trial stubborn oil deposits on a small area first and collect and treat the wastewater as required.

22. Can the element be refitted if it is not completely dry after washing?

The element is metal: drain it and shake off standing water, then refit. Residual moisture leaves as white vapour once the engine warms up, which is normal; a metal DPF needs no anti-oxidation treatment and generally no dedicated drying, and uncontrolled high-temperature baking that could cause damage should be avoided. Avoid long-term sealed storage with visible free water, and prevent water entering backpressure tapping lines, sensors, electrical connectors or catalyst-coated parts – for those configurations, drain and dry fully per the relevant manual. For ceramic or other media, follow that product manual. Before refitting, still check gasket seating and bolt torque and record the cleaning and drying method.

23. What precautions apply to outdoor washing and storage in winter?

Per the AIFILTECH metal DPF maintenance guide, outdoor water washing in winter has no special effect on the metal element; it is not sensitive to water temperature, and after rinsing and draining it can be refitted, with residual moisture leaving as white vapour on warm-up. Store washed elements drained in a dry place; no anti-oxidation treatment is needed. A frozen element must not be struck forcibly or thawed with sudden high heat, which can damage the structure. Winter work focuses on personnel and environment: anti-slip measures on icy surfaces, protection from hot surfaces and exhaust, outdoor lighting and ventilation, and compliant wastewater collection to avoid ice hazards and secondary contamination. Reserve elements are stored washed and drained in a dry, dust-free place; systems with sensors, electrical parts, catalyst coatings or ceramic media follow the corresponding manual for freeze protection, drying and storage.

24. If black smoke persists or backpressure stays high after cleaning, what should be checked?

First confirm cleaning and drying were adequate and differential-pressure measurement is normal, then check for element damage or stubborn ash blocking, gaskets and clamps, bypass valves, tapping lines, piping leaks and engine combustion. Unusually low differential pressure with black smoke points to bypass or damage; persistently high differential pressure points to ash, deformation and flow-channel blockage.

25. How often should gaskets, bolts and drain ports be inspected?

Check seals and fasteners at every removal, watch for leak marks, looseness and corrosion during daily rounds, and inspect drain ports according to ash build-up and use frequency; write the interval into the product maintenance table. Re-torque to specification after high-temperature cycling where needed, and replace gaskets that are crushed, carbonised, deformed or damaged rather than reusing them indefinitely.

26. What safety precautions apply to hot surfaces, hot exhaust, wastewater and handling elements?

Before maintenance, stop and cool the equipment, apply lockout/tagout (LOTO), verify zero pressure, no high temperature and no unintended start-up risk, and set burn warnings and barriers. Keep exhaust areas ventilated against carbon monoxide and oxygen deficiency. Confined spaces such as ducts, housings, tanks and underground plant rooms require a work permit, ventilation and testing first, continuous monitoring and never solo entry. On bypass systems confirm the bypass interlock works; do not run permanently on bypass or suppress alarms. Use suitable protection and collect wastewater and cleaners compliantly; lift or two-person-handle elements by weight and fragility with cut- and dust-resistant protection. Never wash hot or pressurised equipment without authorisation; follow site safety rules, LOTO procedures and local regulations.

27. Are maintenance record sheets and cleaning log templates provided?

Electronic and paper templates are recommended with the equipment, with fields for equipment and element numbers, operating hours, backpressure before and after cleaning, exhaust temperature, cleaning method, water and cleaner, drying, inspection result, replaced parts, wastewater and operator. Long-term records help optimise intervals, support warranty decisions and ease handover between drivers.

28. Is centralised or automatic washing equipment worthwhile for large fleets?

It is usually worth evaluating when element counts are high, cleaning frequent, labour cost or downtime loss significant, but compare equipment investment, space, utilities, drying, wastewater, maintenance and spare-element turnover. Use annual cleaning count multiplied by single-cleaning total cost versus the annual cost of the automatic option for a break-even calculation, and retain manual inspection; automation does not remove the need for condition assessment.

29. How is whole-life cost calculated across purchase, installation, cleaning, downtime, spares and energy?

Calculate over the same evaluation period and duty: initial equipment and non-standard design, plus international freight and insurance, import duty and import-stage taxes and clearance (allocated by trade term, with currency and exchange rate), installation modification and lifting, energy (induced-draft fan power, compressed air or pulse gas, active regeneration energy), consumables (AUS 32 urea per ISO 22241 for SCR, seals, sensors), cleaning (water, cleaner, labour, wastewater disposal, spare-element turnover), spare parts and element replacement by interval, downtime losses, testing/re-testing/annual inspection, training and maintenance labour, minus residual value, then convert to annual or per-operating-hour cost. Cleaning frequency follows backpressure and actual ash rather than a fixed calendar; reductant and energy follow operating hours and load. Comparisons must use the same flow, operating regime, life assumptions, evaluation period and discount basis, with all inputs labelled as assumptions and performance guarantees and acceptance conditions written into the agreement.

30. Versus disposable elements, ceramic DPF or replacing the whole unit, how long is the payback?

Payback is incremental investment divided by annual net savings, with savings from fewer disposable elements, less cleaning and downtime, and changes in energy and maintenance – not from comparing first quotations alone. Equipment with low operating hours or low maintenance cost may pay back more slowly; high utilisation and frequent element replacement favour it. A calculation example with stated assumptions can be provided; a fixed payback period in months is not promised.

Related FAQ guides and further reading

Need a model confirmed for your duty, or the technical documentation? Send the gas or engine parameters, target emissions and site conditions, and we will check the applicable model and acceptance basis against the data.

Bruce Wen · +86 188 1936 6808 (mobile / WhatsApp / WeChat) · bruce.wen@aifiltech.com

WhatsApp